 "pcon24cd": "S14000074",
 "name": "Dumfriesshire, Clydesdale and Tweeddale",
 "nation": "Scotland",
 "number1": {
  "visible": true,
  "cost_gbp_12m": 15000000,
  "cost_gbp_12m_exact": 14905290,
  "curtailed_mwh_12m": 320514,
  "rank_of_visible": 5,
  "visible_seats": 19,
  "framings": {
   "hours_of_seat_homes_electricity": 4879.2,
   "homes_for_a_year_energy_lost": 128000
  },
  "sites": [
   {
    "site_name": "Sandy Knowe Wind Farm",
    "repd_ref_id": 6703,
    "cost_gbp_12m": 2600000,
    "curtailed_mwh_12m": 64216,
    "homes_for_a_year": 26000,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Clyde Wind Farm",
    "repd_ref_id": 4011,
    "cost_gbp_12m": 2400000,
    "curtailed_mwh_12m": 26055,
    "homes_for_a_year": 10000,
    "mapping_confidence": "medium"
   },
   {
    "site_name": "Kennoxhead Wind Farm",
    "repd_ref_id": 4385,
    "cost_gbp_12m": 1600000,
    "curtailed_mwh_12m": 44888,
    "homes_for_a_year": 18000,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Harestanes",
    "repd_ref_id": 4119,
    "cost_gbp_12m": 1300000,
    "curtailed_mwh_12m": 15378,
    "homes_for_a_year": 6200,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Twentyshilling Hill Wind Farm",
    "repd_ref_id": 6590,
    "cost_gbp_12m": 1200000,
    "curtailed_mwh_12m": 41555,
    "homes_for_a_year": 17000,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Cumberhead Wind Farm",
    "repd_ref_id": 5455,
    "cost_gbp_12m": 1100000,
    "curtailed_mwh_12m": 45685,
    "homes_for_a_year": 18000,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Douglas West and Dalquhandy Renewable Energy Project",
    "repd_ref_id": 5393,
    "cost_gbp_12m": 1000000,
    "curtailed_mwh_12m": 34336,
    "homes_for_a_year": 14000,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Clyde Wind Farm Extension (Clyde 2)",
    "repd_ref_id": 4178,
    "cost_gbp_12m": 950000,
    "curtailed_mwh_12m": 9781,
    "homes_for_a_year": 3900,
    "mapping_confidence": "medium"
   },
   {
    "site_name": "Middle Muir Wind Farm",
    "repd_ref_id": 4440,
    "cost_gbp_12m": 910000,
    "curtailed_mwh_12m": 14783,
    "homes_for_a_year": 5900,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Ewe Hill (extension)",
    "repd_ref_id": 3627,
    "cost_gbp_12m": 760000,
    "curtailed_mwh_12m": 9792,
    "homes_for_a_year": 3900,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Minnygap",
    "repd_ref_id": 4437,
    "cost_gbp_12m": 410000,
    "curtailed_mwh_12m": 5141,
    "homes_for_a_year": 2100,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Whiteside Hill",
    "repd_ref_id": 4502,
    "cost_gbp_12m": 230000,
    "curtailed_mwh_12m": 2526,
    "homes_for_a_year": 1000,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Minsca",
    "repd_ref_id": 4517,
    "cost_gbp_12m": 130000,
    "curtailed_mwh_12m": 1306,
    "homes_for_a_year": 500,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Dalswinton",
    "repd_ref_id": 4520,
    "cost_gbp_12m": 81000,
    "curtailed_mwh_12m": 789,
    "homes_for_a_year": 300,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Andershaw",
    "repd_ref_id": 4110,
    "cost_gbp_12m": 68000,
    "curtailed_mwh_12m": 696,
    "homes_for_a_year": 300,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Hagshaw Hill Wind Farm Extension",
    "repd_ref_id": 3220,
    "cost_gbp_12m": 42000,
    "curtailed_mwh_12m": 3588,
    "homes_for_a_year": 1400,
    "mapping_confidence": "high"
   }
  ],
  "invisible_wind": {
   "mw": 321.0,
   "sites": 12
  }
 },
 "number2": {
  "stuck_mw": 913.3,
  "stuck_mw_int": 913,
  "stuck_sites": 18,
  "homes_equivalent": 773000,
  "homes_vs_seat_households": 18.85,
  "stuck_mw_12m_cut": 913.8,
  "consented_not_built_mw_any_age": 991.4,
  "operational_mw": 1451.3,
  "operational_homes_equivalent": 1269000,
  "refused_5y_mw": 933.2,
  "withdrawn_5y_mw": 50.6,
  "median_months_to_decision": 26.4,
  "rank": 2,
  "tech_mix": {
   "onshore wind": 862.2,
   "solar": 51.1
  },
  "tech_summary": "almost all onshore wind",
  "waiting_vs_running": 0.6,
  "projects": [
   {
    "site_name": "Sanquhar 2 Community Wind Farm",
    "repd_ref_id": 6629,
    "technology": "Wind Onshore",
    "capacity_mw": 308.0,
    "homes_equivalent": 269000,
    "consented": "2023-08-31",
    "months_waiting": 35.1,
    "status": "Under Construction"
   },
   {
    "site_name": "Cumberhead West Wind Farm",
    "repd_ref_id": 3328,
    "technology": "Wind Onshore",
    "capacity_mw": 126.0,
    "homes_equivalent": 110000,
    "consented": "2021-11-18",
    "months_waiting": 56.5,
    "status": "Under Construction"
   },
   {
    "site_name": "Douglas West Wind Farm (extension)",
    "repd_ref_id": 6826,
    "technology": "Wind Onshore",
    "capacity_mw": 78.0,
    "homes_equivalent": 68000,
    "consented": "2021-11-18",
    "months_waiting": 56.5,
    "status": "Under Construction"
   },
   {
    "site_name": "Kennoxhead Wind Farm",
    "repd_ref_id": 4385,
    "technology": "Wind Onshore",
    "capacity_mw": 62.0,
    "homes_equivalent": 54000,
    "consented": "2015-07-23",
    "months_waiting": 132.4,
    "status": "Under Construction"
   },
   {
    "site_name": "Whitelaw Brae Wind Farm",
    "repd_ref_id": 3317,
    "technology": "Wind Onshore",
    "capacity_mw": 57.0,
    "homes_equivalent": 50000,
    "consented": "2017-12-07",
    "months_waiting": 103.8,
    "status": "Under Construction"
   },
   {
    "site_name": "Cloud Hill Wind Farm",
    "repd_ref_id": 11112,
    "technology": "Wind Onshore",
    "capacity_mw": 56.0,
    "homes_equivalent": 49000,
    "consented": "2025-12-16",
    "months_waiting": 7.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Priestgill Wind Farm",
    "repd_ref_id": 6363,
    "technology": "Wind Onshore",
    "capacity_mw": 46.2,
    "homes_equivalent": 40000,
    "consented": "2021-12-15",
    "months_waiting": 55.6,
    "status": "Under Construction"
   },
   {
    "site_name": "Kennoxhead Wind Farm Extension II (Penbreck) (Phase 2)",
    "repd_ref_id": 8001,
    "technology": "Wind Onshore",
    "capacity_mw": 45.6,
    "homes_equivalent": 40000,
    "consented": "2023-02-20",
    "months_waiting": 41.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Kennoxhead Wind Farm Extension (Phase 2)",
    "repd_ref_id": 7204,
    "technology": "Wind Onshore",
    "capacity_mw": 38.4,
    "homes_equivalent": 34000,
    "consented": "2021-03-10",
    "months_waiting": 64.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Jockstown Farm Solar Farm",
    "repd_ref_id": 8488,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 37.9,
    "homes_equivalent": 14000,
    "consented": "2022-11-22",
    "months_waiting": 44.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Twentyshilling Hill Wind Farm",
    "repd_ref_id": 6590,
    "technology": "Wind Onshore",
    "capacity_mw": 37.8,
    "homes_equivalent": 33000,
    "consented": "2019-12-23",
    "months_waiting": 79.3,
    "status": "Under Construction"
   },
   {
    "site_name": "Glenmuckloch Wind Farm",
    "repd_ref_id": 4492,
    "technology": "Wind Onshore",
    "capacity_mw": 33.6,
    "homes_equivalent": 29000,
    "consented": "2017-05-16",
    "months_waiting": 110.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Kennoxhead Wind Farm (Phase 2)",
    "repd_ref_id": 11917,
    "technology": "Wind Onshore",
    "capacity_mw": 28.0,
    "homes_equivalent": 24000,
    "consented": "2022-06-14",
    "months_waiting": 49.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Sandy Knowe Wind Farm Extension",
    "repd_ref_id": 12079,
    "technology": "Wind Onshore",
    "capacity_mw": 21.6,
    "homes_equivalent": 19000,
    "consented": "2025-08-26",
    "months_waiting": 11.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Central Eco Park - Solar Farm",
    "repd_ref_id": 10409,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 12.0,
    "homes_equivalent": 4400,
    "consented": "2023-02-14",
    "months_waiting": 41.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Hazelside farm",
    "repd_ref_id": 3633,
    "technology": "Wind Onshore",
    "capacity_mw": 1.6,
    "homes_equivalent": 1400,
    "consented": "2014-12-18",
    "months_waiting": 139.5,
    "status": "Under Construction"
   },
   {
    "site_name": "Cochran Limited, Three Trees Road - Solar Panels",
    "repd_ref_id": 14292,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2023-12-05",
    "months_waiting": 31.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Rammerscales Sawmill - Solar Array & Battery Storage",
    "repd_ref_id": 17606,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2025-02-06",
    "months_waiting": 17.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Harbro, Birkhill Commercial Park - Solar Panels",
    "repd_ref_id": 13178,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.4,
    "homes_equivalent": 100,
    "consented": "2023-08-24",
    "months_waiting": 35.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Samye Ling Centre - Solar Panels",
    "repd_ref_id": 16121,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2024-07-17",
    "months_waiting": 24.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Birkhill Mill, Cairnhouses Road - Wind Turbines",
    "repd_ref_id": 13097,
    "technology": "Wind Onshore",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2023-05-10",
    "months_waiting": 38.8,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 40997,
  "seat_total_gbp": 3800000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 1209.9,
  "approved_mw": 1702.0,
  "approved_24m_mw": 24.0,
  "refused_mw": 207.0,
  "submitted_mw": 1754.5,
  "sites": [
   {
    "site_name": "Coalburn II Energy Storage Facility - Battery Storage Facility",
    "capacity_mw": 1000.0,
    "status": "building",
    "year": 2024,
    "homes_while_discharging": 3504000
   },
   {
    "site_name": "High Netherfauld House Farm 1, Tower Road - Battery Energy Storage System",
    "capacity_mw": 502.5,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 1761000
   },
   {
    "site_name": "Redshaw Battery Energy Storage",
    "capacity_mw": 500.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 1752000
   },
   {
    "site_name": "Gretna Green Battery Storage",
    "capacity_mw": 456.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 1598000
   },
   {
    "site_name": "Lagrae Battery Energy Storage System",
    "capacity_mw": 400.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 1402000
   },
   {
    "site_name": "Red Moss - Battery Storage",
    "capacity_mw": 342.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 1198000
   },
   {
    "site_name": "Hagshaw Energy Cluster \u2013 Western Expansion",
    "capacity_mw": 225.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 788000
   },
   {
    "site_name": "Scoop Hill Wind Farm",
    "capacity_mw": 200.0,
    "status": "refused",
    "year": 2026,
    "homes_while_discharging": 701000
   },
   {
    "site_name": "Carlisle Road - Battery Energy Storage System",
    "capacity_mw": 200.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 701000
   },
   {
    "site_name": "Bodinglee Wind Farm",
    "capacity_mw": 106.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 371000
   },
   {
    "site_name": "Daer Wind Farm",
    "capacity_mw": 100.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 350000
   },
   {
    "site_name": "Harestanes Windfarm",
    "capacity_mw": 100.0,
    "status": "building",
    "year": 2019,
    "homes_while_discharging": 350000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Coalburn II Energy Storage Facility - Battery Storage Facility",
   "repd_ref_id": 12206,
   "technology": "Battery",
   "capacity_mw": 1000.0,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2024-01-24",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004698",
   "operator": "Alcemi Storage Development Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "High Netherfauld House Farm 1, Tower Road - Battery Energy Storage System",
   "repd_ref_id": 18157,
   "technology": "Battery",
   "capacity_mw": 502.5,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00006063",
   "operator": "ESB (Harker) Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 15 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-05-12",
     "months_waiting": 15
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Redshaw Battery Energy Storage",
   "repd_ref_id": 16473,
   "technology": "Battery",
   "capacity_mw": 500.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-08-20",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00005122",
   "operator": "BayWa r.e. UK Limited",
   "reason": {
    "reason": "gate2",
    "label": "Still in the grid queue review \u2014 no firm connection date yet",
    "who": "the grid operator (NESO)",
    "evidence": {
     "project": "Redshaw Energy Park",
     "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet"
    },
    "all_matches": [
     "gate2",
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2031",
   "tec": {
    "project": "Redshaw Energy Park",
    "connection_date": "2031-10-30",
    "connection_year": 2031,
    "mw": 500.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Gretna Green Battery Storage",
   "repd_ref_id": 15427,
   "technology": "Battery",
   "capacity_mw": 456.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-03-17",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004986",
   "operator": "Gresham House Devco Pipeline",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-03-17",
     "years_since_consent": 1.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Scoop Hill Wind Farm",
   "repd_ref_id": 7454,
   "technology": "Wind Onshore",
   "capacity_mw": 432.0,
   "homes_equivalent": 378000,
   "status": "Application Refused",
   "consented": null,
   "refused": "2026-02-05",
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00000533",
   "operator": "Community Wind Power Limited",
   "reason": {
    "reason": "refused",
    "label": "Refused by the Scottish Government (it decides big energy projects) in 2026",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "refusal_date": "2026-02-05"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Lagrae Battery Energy Storage System",
   "repd_ref_id": 15529,
   "technology": "Battery",
   "capacity_mw": 400.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004991",
   "operator": "Buccleuch Estates Limited",
   "reason": {
    "reason": "gate2",
    "label": "Still in the grid queue review \u2014 no firm connection date yet",
    "who": "the grid operator (NESO)",
    "evidence": {
     "project": "Lagrae Battery Storage",
     "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet"
    },
    "all_matches": [
     "gate2",
     "connection_date",
     "in_planning"
    ]
   },
   "earliest": "2036",
   "tec": {
    "project": "Lagrae Battery Storage",
    "connection_date": "2036-10-31",
    "connection_year": 2036,
    "mw": 400.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Glenmuckloch Pumped Storage Hydro",
   "repd_ref_id": 6871,
   "technology": "Pumped Storage Hydroelectricity",
   "capacity_mw": 400.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2016-11-29",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "EC00005236",
   "operator": "Buccleuch Estates",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 10 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2016-11-29",
     "years_since_consent": 9.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Red Moss - Battery Storage",
   "repd_ref_id": 15980,
   "technology": "Battery",
   "capacity_mw": 342.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-06-19",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00005043",
   "operator": "Green Switch Capital Limited",
   "reason": {
    "reason": "gate2",
    "label": "Still in the grid queue review \u2014 no firm connection date yet",
    "who": "the grid operator (NESO)",
    "evidence": {
     "project": "Red Moss Farm",
     "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet"
    },
    "all_matches": [
     "gate2",
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2030",
   "tec": {
    "project": "Red Moss Farm",
    "connection_date": "2030-10-30",
    "connection_year": 2030,
    "mw": 300.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Faw Side Community Wind Farm",
   "repd_ref_id": 6459,
   "technology": "Wind Onshore",
   "capacity_mw": 315.0,
   "homes_equivalent": 275000,
   "status": "Application Refused",
   "consented": null,
   "refused": "2023-12-22",
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00001833",
   "operator": "Community Windpower",
   "reason": {
    "reason": "refused",
    "label": "Refused by the Scottish Government (it decides big energy projects) in 2023",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "refusal_date": "2023-12-22"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Sanquhar 2 Community Wind Farm",
   "repd_ref_id": 6629,
   "technology": "Wind Onshore",
   "capacity_mw": 308.0,
   "homes_equivalent": 269000,
   "status": "Under Construction",
   "consented": "2023-08-31",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00001801",
   "operator": "Community Windpower",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Bodinglee Wind Farm",
   "repd_ref_id": 13638,
   "technology": "Wind Onshore",
   "capacity_mw": 266.0,
   "homes_equivalent": 233000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004839",
   "operator": "Banks Group",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 3.1 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2023-06-22",
     "months_waiting": 37
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Hagshaw Energy Cluster \u2013 Western Expansion",
   "repd_ref_id": 12286,
   "technology": "Battery",
   "capacity_mw": 225.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004623",
   "operator": "3R Energy Solutions Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 15 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-05-08",
     "months_waiting": 15
    },
    "all_matches": [
     "planning_overdue",
     "connection_date"
    ]
   },
   "earliest": "2028",
   "tec": {
    "project": "Hagshaw Energy Cluster Western Expansion",
    "connection_date": "2028-07-01",
    "connection_year": 2028,
    "mw": 400.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Rivox Wind Farm - Wind farm",
   "repd_ref_id": 9317,
   "technology": "Wind Onshore",
   "capacity_mw": 208.0,
   "homes_equivalent": 182000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003293",
   "operator": "Belltown Power Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 3.1 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2023-07-10",
     "months_waiting": 37
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Carlisle Road - Battery Energy Storage System",
   "repd_ref_id": 9684,
   "technology": "Battery",
   "capacity_mw": 200.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-04-28",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004799",
   "operator": "Zenobe Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-04-28",
     "years_since_consent": 1.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Scoop Hill Wind Farm",
   "repd_ref_id": 20966,
   "technology": "Battery",
   "capacity_mw": 200.0,
   "homes_equivalent": null,
   "status": "Application Refused",
   "consented": null,
   "refused": "2026-02-05",
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00000533",
   "operator": "Community Wind Power Limited",
   "reason": {
    "reason": "refused",
    "label": "Refused by the Scottish Government (it decides big energy projects) in 2026",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "refusal_date": "2026-02-05"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "M74 West Renewable Energy Park",
   "repd_ref_id": 16025,
   "technology": "Wind Onshore",
   "capacity_mw": 165.0,
   "homes_equivalent": 144000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00005019",
   "operator": "Renewco Power",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 22 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2024-09-24",
     "months_waiting": 22
    },
    "all_matches": [
     "planning_overdue",
     "connection_date"
    ]
   },
   "earliest": "2029",
   "tec": {
    "project": "M74 West Wind Farm",
    "connection_date": "2029-10-31",
    "connection_year": 2029,
    "mw": 180.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Lowther Hills (North Lowther Energy Initiative)",
   "repd_ref_id": 5181,
   "technology": "Wind Onshore",
   "capacity_mw": 147.0,
   "homes_equivalent": 129000,
   "status": "Appeal Refused",
   "consented": null,
   "refused": "2023-01-08",
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00000426",
   "operator": "Forsa (formerly 2020 Renewables/ Buccleuch)",
   "reason": {
    "reason": "refused",
    "label": "Refused by the Scottish Government (it decides big energy projects) in 2023",
    "who": "the planning appeal inspector",
    "evidence": {
     "refusal_date": "2023-01-08"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Grayside Wind Farm",
   "repd_ref_id": 8003,
   "technology": "Wind Onshore",
   "capacity_mw": 147.0,
   "homes_equivalent": 129000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003446",
   "operator": "Grayside WF",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 4.3 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2022-03-31",
     "months_waiting": 52
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Hagshaw Energy Cluster \u2013 Western Expansion",
   "repd_ref_id": 12284,
   "technology": "Wind Onshore",
   "capacity_mw": 130.0,
   "homes_equivalent": 114000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004623",
   "operator": "3R Energy Solutions Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 15 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-05-08",
     "months_waiting": 15
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Bloch Wind Farm & Battery Storage (Solway Bank Extension)",
   "repd_ref_id": 10999,
   "technology": "Wind Onshore",
   "capacity_mw": 126.0,
   "homes_equivalent": 110000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003463",
   "operator": "Renewable Energy Systems (RES)",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 3.8 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2022-11-02",
     "months_waiting": 45
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Euchanhead Wind Farm",
   "repd_ref_id": 3586,
   "technology": "Wind Onshore",
   "capacity_mw": 126.0,
   "homes_equivalent": 110000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00002141",
   "operator": "ScottishPower Renewables UK Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 5.7 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2020-11-30",
     "months_waiting": 68
    },
    "all_matches": [
     "planning_overdue",
     "connection_date"
    ]
   },
   "earliest": "2030",
   "tec": {
    "project": "Euchanhead Wind Farm",
    "connection_date": "2030-10-29",
    "connection_year": 2030,
    "mw": 112.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Cumberhead West Wind Farm",
   "repd_ref_id": 3328,
   "technology": "Wind Onshore",
   "capacity_mw": 126.0,
   "homes_equivalent": 110000,
   "status": "Under Construction",
   "consented": "2021-11-18",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00002171",
   "operator": "3R Energy Solutions Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Bodinglee Wind Farm",
   "repd_ref_id": 14532,
   "technology": "Battery",
   "capacity_mw": 106.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004839",
   "operator": "Banks Group",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 3.1 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2023-06-22",
     "months_waiting": 37
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Daer Wind Farm",
   "repd_ref_id": 9127,
   "technology": "Battery",
   "capacity_mw": 100.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00000740",
   "operator": "E.ON Climate & Renewables UK Developments",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 5.2 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2021-05-26",
     "months_waiting": 62
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Daer Wind Farm",
   "repd_ref_id": 2908,
   "technology": "Wind Onshore",
   "capacity_mw": 100.0,
   "homes_equivalent": 87000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "P/21/1014",
   "operator": "E.ON Climate & Renewables UK Developments",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 5.2 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2021-05-26",
     "months_waiting": 62
    },
    "all_matches": [
     "planning_overdue",
     "connection_date"
    ]
   },
   "earliest": "2028",
   "tec": {
    "project": "Daer Wind Farm",
    "connection_date": "2028-08-01",
    "connection_year": 2028,
    "mw": 96.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Harestanes Windfarm",
   "repd_ref_id": 7395,
   "technology": "Battery",
   "capacity_mw": 100.0,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2019-12-20",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00001870",
   "operator": "ScottishPower Renewables",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2028, 9 years after it was approved",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Harestanes",
     "connection_date": "2028-03-31",
     "mw": 163.3,
     "stage": 2.0,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "building"
    ]
   },
   "earliest": "2028",
   "tec": {
    "project": "Harestanes",
    "connection_date": "2028-03-31",
    "connection_year": 2028,
    "mw": 163.3,
    "stage": 2.0,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Watchman Energy Park",
   "repd_ref_id": 17557,
   "technology": "Wind Onshore",
   "capacity_mw": 91.0,
   "homes_equivalent": 80000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00006030",
   "operator": "Renewco Power",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2026, still waiting for a decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2026-03-12",
     "months_waiting": 5
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Rivox Wind Farm - Wind farm",
   "repd_ref_id": 14533,
   "technology": "Battery",
   "capacity_mw": 90.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003293",
   "operator": "Belltown Power Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 3.1 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2023-07-10",
     "months_waiting": 37
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Leithenwater Wind Energy Hub - Wind Farm",
   "repd_ref_id": 12283,
   "technology": "Wind Onshore",
   "capacity_mw": 85.8,
   "homes_equivalent": 75000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004619",
   "operator": "Belltown Power Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 2.3 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2024-04-04",
     "months_waiting": 28
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Harestanes West Windfarm",
   "repd_ref_id": 13624,
   "technology": "Wind Onshore",
   "capacity_mw": 84.0,
   "homes_equivalent": 73000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004778",
   "operator": "ScottishPower Renewables",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 18 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-01-20",
     "months_waiting": 18
    },
    "all_matches": [
     "planning_overdue",
     "connection_date"
    ]
   },
   "earliest": "2029",
   "tec": {
    "project": "Harestanes West Wind Farm",
    "connection_date": "2029-09-01",
    "connection_year": 2029,
    "mw": 81.0,
    "stage": 1.0,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "M74 West Renewable Energy Park",
   "repd_ref_id": 16026,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 82.5,
   "homes_equivalent": 30000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00005019",
   "operator": "Renewco Power",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 22 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2024-09-24",
     "months_waiting": 22
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Hopsrig Wind Farm",
   "repd_ref_id": 11065,
   "technology": "Wind Onshore",
   "capacity_mw": 79.2,
   "homes_equivalent": 69000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00002160",
   "operator": "Muirhall Energy Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 5.8 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2020-10-23",
     "months_waiting": 69
    },
    "all_matches": [
     "planning_overdue",
     "gate2",
     "connection_date"
    ]
   },
   "earliest": "2027",
   "tec": {
    "project": "Hopsrig Wind Farm",
    "connection_date": "2027-10-31",
    "connection_year": 2027,
    "mw": 48.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": "Cleared the grid queue review, so it now has a firm connection date",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Douglas West Wind Farm (extension)",
   "repd_ref_id": 6826,
   "technology": "Wind Onshore",
   "capacity_mw": 78.0,
   "homes_equivalent": 68000,
   "status": "Under Construction",
   "consented": "2021-11-18",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00001836",
   "operator": "ScottishPower Renewables (UK) Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Cloich Forest Wind Farm",
   "repd_ref_id": 7582,
   "technology": "Wind Onshore",
   "capacity_mw": 63.0,
   "homes_equivalent": 55000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003288",
   "operator": "EDF Energy Renewables",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 5.1 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2021-06-30",
     "months_waiting": 61
    },
    "all_matches": [
     "planning_overdue",
     "connection_date"
    ]
   },
   "earliest": "2029",
   "tec": {
    "project": "Cloich Forest Wind Farm",
    "connection_date": "2029-07-31",
    "connection_year": 2029,
    "mw": 67.2,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Kennoxhead Wind Farm",
   "repd_ref_id": 4385,
   "technology": "Wind Onshore",
   "capacity_mw": 62.0,
   "homes_equivalent": 54000,
   "status": "Under Construction",
   "consented": "2015-07-23",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "EC00002101",
   "operator": "Orsted Onshore Limited",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2028, 13 years after it was approved",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Kennoxhead Wind Farm",
     "connection_date": "2028-04-28",
     "mw": 112.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "building"
    ]
   },
   "earliest": "2028",
   "tec": {
    "project": "Kennoxhead Wind Farm",
    "connection_date": "2028-04-28",
    "connection_year": 2028,
    "mw": 112.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Hagshaw Energy Cluster \u2013 Western Expansion",
   "repd_ref_id": 12285,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 60.0,
   "homes_equivalent": 22000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004623",
   "operator": "3R Energy Solutions Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 15 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-05-08",
     "months_waiting": 15
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Whitelaw Brae Wind Farm",
   "repd_ref_id": 3317,
   "technology": "Wind Onshore",
   "capacity_mw": 57.0,
   "homes_equivalent": 50000,
   "status": "Under Construction",
   "consented": "2017-12-07",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "EC00002090",
   "operator": "Thrive Renewables",
   "reason": {
    "reason": "gate2",
    "label": "Cleared the grid queue review, so it now has a firm connection date",
    "who": "the grid operator (NESO)",
    "evidence": {
     "project": "Whitelaw Brae Windfarm",
     "gate2_outcome": "Cleared the grid queue review, so it now has a firm connection date"
    },
    "all_matches": [
     "gate2",
     "connection_date",
     "building"
    ]
   },
   "earliest": "2026",
   "tec": {
    "project": "Whitelaw Brae Windfarm",
    "connection_date": "2026-07-31",
    "connection_year": 2026,
    "mw": 57.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": "Cleared the grid queue review, so it now has a firm connection date",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Cloud Hill Wind Farm",
   "repd_ref_id": 11112,
   "technology": "Wind Onshore",
   "capacity_mw": 56.0,
   "homes_equivalent": 49000,
   "status": "Awaiting Construction",
   "consented": "2025-12-16",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003461",
   "operator": "Blue Energy Company / BayWa r.e. UK Limited",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2030, 5 years after it was approved",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Cloud Hill Windfarm",
     "connection_date": "2030-05-31",
     "mw": 60.0,
     "stage": 1.0,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2030",
   "tec": {
    "project": "Cloud Hill Windfarm",
    "connection_date": "2030-05-31",
    "connection_year": 2030,
    "mw": 60.0,
    "stage": 1.0,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Loganhead Wind Farm",
   "repd_ref_id": 16709,
   "technology": "Wind Onshore",
   "capacity_mw": 53.8,
   "homes_equivalent": 47000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00002161",
   "operator": "Muirhall Energy Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 4.7 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2021-11-10",
     "months_waiting": 57
    },
    "all_matches": [
     "planning_overdue",
     "gate2",
     "connection_date"
    ]
   },
   "earliest": "2027",
   "tec": {
    "project": "Loganhead Windfarm",
    "connection_date": "2027-10-31",
    "connection_year": 2027,
    "mw": 36.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": "Cleared the grid queue review, so it now has a firm connection date",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Tweed Valley, Southern Uplands - Oliver Forest Wind Farm",
   "repd_ref_id": 12855,
   "technology": "Wind Onshore",
   "capacity_mw": 50.4,
   "homes_equivalent": 44000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004669",
   "operator": "Statkraft UK Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 23 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2024-08-30",
     "months_waiting": 23
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Watchman Energy Park",
   "repd_ref_id": 17558,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00006030",
   "operator": "Renewco Power",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2026, still waiting for a decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2026-03-12",
     "months_waiting": 5
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "M74 West Renewable Energy Park",
   "repd_ref_id": 16027,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00005019",
   "operator": "Renewco Power",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 22 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2024-09-24",
     "months_waiting": 22
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Chapelcross - Hydrogen Production Facility",
   "repd_ref_id": 18389,
   "technology": "Hydrogen",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "26/0072/FUL",
   "operator": "Creca Hydrogen Limited",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2026, still waiting for a decision",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "submitted": "2026-02-13",
     "months_waiting": 6
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Milton Farm - Energy Storage System",
   "repd_ref_id": 13846,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-07-30",
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "24/1264/FUL",
   "operator": "Renewco Power",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-07-30",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Milton Farm - Energy Storage System",
   "repd_ref_id": 16895,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-07-30",
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "24/1264/FUL",
   "operator": "Renewco Power",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-07-30",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Leadhills Road, Elvanfoot Phase 2 - BESS",
   "repd_ref_id": 20588,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "South Lanarkshire",
   "planning_ref": "P/26/0243",
   "operator": "Elvanfoot Energy Storage 2 Limited",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2026, still waiting for a decision",
    "who": "South Lanarkshire Council",
    "evidence": {
     "submitted": "2026-03-04",
     "months_waiting": 5
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "East Kilbride - Battery storage",
   "repd_ref_id": 9013,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2022-08-22",
   "refused": null,
   "planning_authority": "South Lanarkshire",
   "planning_ref": "P/22/0472",
   "operator": "Engie Regeneration Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Scawd Law Wind Farm",
   "repd_ref_id": 8002,
   "technology": "Wind Onshore",
   "capacity_mw": 48.0,
   "homes_equivalent": 42000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00002111",
   "operator": "Fred Olsen Renewables",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 3.6 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2022-12-22",
     "months_waiting": 43
    },
    "all_matches": [
     "planning_overdue",
     "gate2",
     "connection_date"
    ]
   },
   "earliest": "2032",
   "tec": {
    "project": "Scawd Law Wind Farm",
    "connection_date": "2032-04-30",
    "connection_year": 2032,
    "mw": 64.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Priestgill Wind Farm",
   "repd_ref_id": 6363,
   "technology": "Wind Onshore",
   "capacity_mw": 46.2,
   "homes_equivalent": 40000,
   "status": "Under Construction",
   "consented": "2021-12-15",
   "refused": "2017-08-16",
   "planning_authority": "South Lanarkshire",
   "planning_ref": "CL/17/0009",
   "operator": "Muirhall Energy",
   "reason": {
    "reason": "gate2",
    "label": "Cleared the grid queue review, so it now has a firm connection date",
    "who": "the grid operator (NESO)",
    "evidence": {
     "project": "Priestgill Wind Farm",
     "gate2_outcome": "Cleared the grid queue review, so it now has a firm connection date"
    },
    "all_matches": [
     "gate2",
     "connection_date",
     "building"
    ]
   },
   "earliest": "2026",
   "tec": {
    "project": "Priestgill Wind Farm",
    "connection_date": "2026-11-30",
    "connection_year": 2026,
    "mw": 43.63,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": "Cleared the grid queue review, so it now has a firm connection date",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Kennoxhead Wind Farm Extension II (Penbreck) (Phase 2)",
   "repd_ref_id": 8001,
   "technology": "Wind Onshore",
   "capacity_mw": 45.6,
   "homes_equivalent": 40000,
   "status": "Awaiting Construction",
   "consented": "2023-02-20",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003263",
   "operator": "Orsted Onshore Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-02-20",
     "years_since_consent": 3.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Bloch Wind Farm & Battery Storage (Solway Bank Extension)",
   "repd_ref_id": 12760,
   "technology": "Battery",
   "capacity_mw": 45.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003463",
   "operator": "Renewable Energy Systems (RES)",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 3.8 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2022-11-02",
     "months_waiting": 45
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Glentaggart - Battery Energy Storage",
   "repd_ref_id": 18360,
   "technology": "Battery",
   "capacity_mw": 42.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2026-01-29",
   "refused": null,
   "planning_authority": "South Lanarkshire",
   "planning_ref": "P/25/0685",
   "operator": "South Lanarkshire Council  / Brockwell Energy Limited",
   "reason": {
    "reason": "gate2",
    "label": "Still in the grid queue review \u2014 no firm connection date yet",
    "who": "the grid operator (NESO)",
    "evidence": {
     "project": "Glentaggart 42MW BESS",
     "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet"
    },
    "all_matches": [
     "gate2",
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2027",
   "tec": {
    "project": "Glentaggart 42MW BESS",
    "connection_date": "2027-10-31",
    "connection_year": 2027,
    "mw": 42.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Cumberhead West Wind Farm",
   "repd_ref_id": 15343,
   "technology": "Battery",
   "capacity_mw": 40.0,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2021-11-18",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00002171",
   "operator": "3R Energy Solutions Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Callisterhall Wind Farm -  Wind Farm & Battery Storage",
   "repd_ref_id": 9889,
   "technology": "Wind Onshore",
   "capacity_mw": 39.2,
   "homes_equivalent": 34000,
   "status": "Application Refused",
   "consented": null,
   "refused": "2022-12-19",
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "22/0930/FUL",
   "operator": "Epower Limited",
   "reason": {
    "reason": "refused",
    "label": "Refused by Dumfries and Galloway Council in 2022",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "refusal_date": "2022-12-19"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Kennoxhead Wind Farm Extension (Phase 2)",
   "repd_ref_id": 7204,
   "technology": "Wind Onshore",
   "capacity_mw": 38.4,
   "homes_equivalent": 34000,
   "status": "Awaiting Construction",
   "consented": "2021-03-10",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00002038",
   "operator": "Orsted Onshore Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 5 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2021-03-10",
     "years_since_consent": 5.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Jockstown Farm Solar Farm",
   "repd_ref_id": 8488,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 37.9,
   "homes_equivalent": 14000,
   "status": "Awaiting Construction",
   "consented": "2022-11-22",
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "21/2491/FUL",
   "operator": "Green Energy International",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-11-22",
     "years_since_consent": 3.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Twentyshilling Hill Wind Farm",
   "repd_ref_id": 6590,
   "technology": "Wind Onshore",
   "capacity_mw": 37.8,
   "homes_equivalent": 33000,
   "status": "Under Construction",
   "consented": "2019-12-23",
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "18/0206/FUL",
   "operator": "Element Power",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Rowancraig North - Wind Farm",
   "repd_ref_id": 11811,
   "technology": "Wind Onshore",
   "capacity_mw": 36.0,
   "homes_equivalent": 31000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "24/0025/FUL",
   "operator": "Koehler Renewable Energy",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 2.6 years for a planning decision",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "submitted": "2024-01-12",
     "months_waiting": 31
    },
    "all_matches": [
     "planning_overdue",
     "gate2",
     "connection_date"
    ]
   },
   "earliest": "2028",
   "tec": {
    "project": "Rowancraig Wind Farm",
    "connection_date": "2028-10-30",
    "connection_year": 2028,
    "mw": 40.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Glenmuckloch Wind Farm",
   "repd_ref_id": 4492,
   "technology": "Wind Onshore",
   "capacity_mw": 33.6,
   "homes_equivalent": 29000,
   "status": "Awaiting Construction",
   "consented": "2017-05-16",
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "15/P/3/0236",
   "operator": "Forsa (formerly Buccleuch/2020)",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2029, 12 years after it was approved",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Glenmuckloch Wind Farm",
     "connection_date": "2029-05-31",
     "mw": 33.6,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2029",
   "tec": {
    "project": "Glenmuckloch Wind Farm",
    "connection_date": "2029-05-31",
    "connection_year": 2029,
    "mw": 33.6,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Glenmuckloch Hill Wind Farm, Kirkconnel - Wind Turbines",
   "repd_ref_id": 16862,
   "technology": "Wind Onshore",
   "capacity_mw": 33.6,
   "homes_equivalent": 29000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "25/2122/FUL",
   "operator": "Glenmuckloch Renewable Energy Limited",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2025, still waiting for a decision",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "submitted": "2025-11-21",
     "months_waiting": 8
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Sandy Knowe Wind Farm Extension",
   "repd_ref_id": 12080,
   "technology": "Battery",
   "capacity_mw": 28.4,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-08-26",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003274",
   "operator": "Executive Resource Group",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-08-26",
     "years_since_consent": 0.9
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Kennoxhead Wind Farm (Phase 2)",
   "repd_ref_id": 11917,
   "technology": "Wind Onshore",
   "capacity_mw": 28.0,
   "homes_equivalent": 24000,
   "status": "Awaiting Construction",
   "consented": "2022-06-14",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "EC00002101",
   "operator": "Orsted Onshore Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-06-14",
     "years_since_consent": 4.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Elvanfoot, Leadhills Road - Phase 3 - BESS",
   "repd_ref_id": 19839,
   "technology": "Battery",
   "capacity_mw": 25.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "South Lanarkshire",
   "planning_ref": "P/26/0324",
   "operator": "Elvanfoot Energy Storage 3 Limited.",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2026, still waiting for a decision",
    "who": "South Lanarkshire Council",
    "evidence": {
     "submitted": "2026-03-26",
     "months_waiting": 4
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "West Scales Energy Park",
   "repd_ref_id": 18585,
   "technology": "Wind Onshore",
   "capacity_mw": 24.8,
   "homes_equivalent": 22000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "26/0744/FUL",
   "operator": "West Scales Windfarm Limited",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2026, still waiting for a decision",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "submitted": "2026-05-07",
     "months_waiting": 3
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Tweed Valley, Southern Uplands - Oliver Forest Wind Farm",
   "repd_ref_id": 17135,
   "technology": "Battery",
   "capacity_mw": 23.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004669",
   "operator": "Statkraft UK Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 23 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2024-09-04",
     "months_waiting": 23
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Sandy Knowe Wind Farm Extension",
   "repd_ref_id": 12079,
   "technology": "Wind Onshore",
   "capacity_mw": 21.6,
   "homes_equivalent": 19000,
   "status": "Awaiting Construction",
   "consented": "2025-08-26",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003274",
   "operator": "Executive Resource Group",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-08-26",
     "years_since_consent": 0.9
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Douglas West Wind Farm (extension)",
   "repd_ref_id": 7460,
   "technology": "Battery",
   "capacity_mw": 20.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00001836",
   "operator": "Douglas West Extension / 3R Energy Solutions",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 7.3 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2019-04-12",
     "months_waiting": 88
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Hagshaw Hill",
   "repd_ref_id": 7572,
   "technology": "Battery",
   "capacity_mw": 20.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2020-02-26",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00000737",
   "operator": "Scottish Power Renewables",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 6 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2020-02-26",
     "years_since_consent": 6.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Grayside Wind Farm",
   "repd_ref_id": 11113,
   "technology": "Battery",
   "capacity_mw": 20.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003446",
   "operator": "Grayside WF",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 4.3 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2022-03-31",
     "months_waiting": 52
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Douglas West Wind Farm (extension)",
   "repd_ref_id": 9957,
   "technology": "Battery",
   "capacity_mw": 20.0,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2021-11-18",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00001836",
   "operator": "ScottishPower Renewables (UK) Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Hopsrig Wind Farm",
   "repd_ref_id": 11066,
   "technology": "Battery",
   "capacity_mw": 14.1,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00002160",
   "operator": "Muirhall Energy Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 5.8 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2020-10-23",
     "months_waiting": 69
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Scawd Law Wind Farm",
   "repd_ref_id": 13000,
   "technology": "Battery",
   "capacity_mw": 12.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00002111",
   "operator": "Fred Olsen Renewables",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 3.6 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2022-12-22",
     "months_waiting": 43
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Central Eco Park - Solar Farm",
   "repd_ref_id": 10409,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 12.0,
   "homes_equivalent": 4400,
   "status": "Awaiting Construction",
   "consented": "2023-02-14",
   "refused": null,
   "planning_authority": "South Lanarkshire",
   "planning_ref": "P/21/2200",
   "operator": "HY2Go Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-02-14",
     "years_since_consent": 3.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "West Scales Energy Park",
   "repd_ref_id": 18586,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 12.0,
   "homes_equivalent": 4400,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "26/0744/FUL",
   "operator": "West Scales Windfarm Limited",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2026, still waiting for a decision",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "submitted": "2026-05-07",
     "months_waiting": 3
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "West Scales Energy Park",
   "repd_ref_id": 18587,
   "technology": "Battery",
   "capacity_mw": 12.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "26/0744/FUL",
   "operator": "West Scales Windfarm Limited",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2026, still waiting for a decision",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "submitted": "2026-05-07",
     "months_waiting": 3
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Herds Hill Wind Farm - Wind Turbines",
   "repd_ref_id": 13249,
   "technology": "Wind Onshore",
   "capacity_mw": 10.3,
   "homes_equivalent": 9100,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "23/2572/FUL",
   "operator": "Drumbuie Renewables",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 2.7 years for a planning decision",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "submitted": "2023-11-30",
     "months_waiting": 32
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Leithenwater Wind Energy Hub - Wind Farm",
   "repd_ref_id": 16496,
   "technology": "Battery",
   "capacity_mw": 10.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004619",
   "operator": "Belltown Power Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 2.3 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2024-04-04",
     "months_waiting": 28
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Elvanfoot, Leadhills Road - Battery Storage",
   "repd_ref_id": 12900,
   "technology": "Battery",
   "capacity_mw": 9.8,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-02-10",
   "refused": null,
   "planning_authority": "South Lanarkshire",
   "planning_ref": "P/23/0927",
   "operator": "Muirhall Energy Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-02-10",
     "years_since_consent": 1.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Callisterhall Wind Farm -  Wind Farm & Battery Storage",
   "repd_ref_id": 11938,
   "technology": "Battery",
   "capacity_mw": 7.0,
   "homes_equivalent": null,
   "status": "Application Refused",
   "consented": null,
   "refused": "2022-12-19",
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "22/0930/FUL",
   "operator": "Epower Limited",
   "reason": {
    "reason": "refused",
    "label": "Refused by Dumfries and Galloway Council in 2022",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "refusal_date": "2022-12-19"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Arla Lockerbie Creamery - Solar Farm",
   "repd_ref_id": 20606,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 5.0,
   "homes_equivalent": 1800,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "26/0353/FUL",
   "operator": "Scottish Southern Energy Renewables",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2026, still waiting for a decision",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "submitted": "2026-03-09",
     "months_waiting": 5
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Whitelaw Brae Wind farm",
   "repd_ref_id": 6894,
   "technology": "Battery",
   "capacity_mw": 4.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2017-12-07",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "EC00002090",
   "operator": "Thrive Renewables",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 9 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2017-12-07",
     "years_since_consent": 8.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Hazelside farm",
   "repd_ref_id": 3633,
   "technology": "Wind Onshore",
   "capacity_mw": 1.6,
   "homes_equivalent": 1400,
   "status": "Under Construction",
   "consented": "2014-12-18",
   "refused": null,
   "planning_authority": "South Lanarkshire",
   "planning_ref": "CL/14/0132",
   "operator": "Mitchell Farming Partnerships (3R Energy)",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "S14000045",
  "S14000095",
  "S14000081",
  "E14001152",
  "S14000108",
  "S14000073",
  "S14000107",
  "S14000110",
  "S14000092",
  "S14000099"
 ],
 "flags": [],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}