Lichfield
Lichfield has 101 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 37,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.8m across the constituency's 41,812 homes. A 200 MW battery was refused planning here in 2026; while discharging it could have supplied about 701,000 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Colton Mill Farm & Cawarden Springs Farm - Solar Panels | Solar Photovoltaics | 18,000 homes | 49.9 MW | 2021-11 | 4.8 yrs |
| Black Flatts Solar Farm | Solar Photovoltaics | 18,000 homes | 49.9 MW | 2022-05 | 4.2 yrs |
| Newell Rubbermaid, Halifax Avenue - Solar Panels | Solar Photovoltaics | 200 homes | 0.6 MW | 2023-05 | 3.2 yrs |
| Steel Processing Midlands, Burntwood Business Park - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2024-03 | 2.4 yrs |
Plus 2 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Armitage Road, Armitage - Battery Energy Storage | 200 MW | refused 2026 | could supply ≈701,000 homes |
| Lions Den, Hammerwich - Battery Storage Facility | 100 MW | approved, not built 2025 | could supply ≈350,000 homes |
| Hawkesyard Estate, Rugeley Road - Battery Energy Storage | 100 MW | in planning | could supply ≈350,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Dave Robertson said about the grid in Parliament? Search Hansard →