No.46 of 650 · approved, not built MP: Sir Gavin Williamson (Conservative) England

Stone, Great Wyrley and Penkridge

Stone, Great Wyrley and Penkridge has 125 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 45,000 homes. No wind farm here is paid to switch off. Almost every pound of that money goes to wind farms in Scotland, where there is not enough wire capacity to carry the power south. The cost is shared across every bill in Britain, so households here pay too: about £92 a year per household, £3.5m across the constituency's 38,510 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
125 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 45,000 homes — about as many homes as this constituency has. Approved at least two years ago; waiting on the grid, not on planning. That is 21.6× the renewable capacity actually running here.
7 projects · planning database (REPD), July 2026 · how we worked this out
£3.5m
is what the grid gap costs this constituency's 38,510 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

3 of 7 waiting projects · years since approval
Preston Hill Farm, Penkridge - Solar Farm 50 MW
2.5 YRS
Hanyards Lane, Tixall - Solar Energy Park 50 MW
2.1 YRS
Four Ashes, Deepmore Lane - Solar Farm 22 MW
2.0 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Preston Hill Farm, Penkridge - Solar FarmSolar Photovoltaics18,000 homes49.9 MW2024-022.5 yrs
Hanyards Lane, Tixall - Solar Energy ParkSolar Photovoltaics18,000 homes49.5 MW2024-062.1 yrs
Four Ashes, Deepmore Lane - Solar FarmSolar Photovoltaics8,200 homes22.5 MW2024-072.0 yrs
Acton Trussell - Solar SystemSolar Photovoltaics300 homes0.9 MW2022-074.1 yrs
Alpha Manufacturing, Pasturefields - Solar PV SystemSolar Photovoltaics300 homes0.7 MW2022-074.1 yrs
Church Lane, Hixon - Solar PV PanelsSolar Photovoltaics300 homes0.7 MW2022-014.6 yrs
Pillaton Foods, Cannock Road - Solar PanelsSolar Photovoltaics300 homes0.7 MW2024-042.3 yrs

Plus 7 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Oaklands Farm, New Road - Battery Energy Storage70 MWapproved, not built 2024could supply ≈245,000 homes
Levedale Road, Levedale - Battery Energy Storage50 MWapproved, not built 2024could supply ≈175,000 homes
Upper Latherford Farm, Latherford Lane - Battery Energy Storage System50 MWapproved, not built 2024could supply ≈175,000 homes
Hobble Lane, Great Wyrley - Battery Energy Storage50 MWapproved, not built 2025could supply ≈175,000 homes
Chillington Estate, Chillington Park - Battery Storage40 MWapproved, not built 2025could supply ≈140,000 homes
Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage30 MWapproved, not built 2025could supply ≈105,000 homes
Yew Tree Farm, Drointon Lane30 MWcould supply ≈105,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Sir Gavin Williamson said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)